{"id":23004,"date":"2026-11-03T13:44:07","date_gmt":"2026-11-03T10:44:07","guid":{"rendered":"https:\/\/mbaplant.com\/?p=23004"},"modified":"2026-11-03T13:44:08","modified_gmt":"2026-11-03T10:44:08","slug":"libya-benghazi-bitumen-melting-project","status":"publish","type":"post","link":"https:\/\/mbaplant.com\/en\/libya-benghazi-bitumen-melting-project\/","title":{"rendered":"Bitumen Melting and Heating System Commissioned in Benghazi, Libya"},"content":{"rendered":"\n<header class=\"wp-block-uagb-container uagb-block-a3nrdo09 alignfull uagb-is-root-container\"><div class=\"uagb-container-inner-blocks-wrap\">\n<div class=\"wp-block-uagb-info-box uagb-block-hhpbujfv uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h1 class=\"uagb-ifb-title\">Bitumen Melting and Heating System Commissioned in Benghazi, Libya !<\/h1><\/div><\/div><\/div>\n<\/div><\/header>\n\n\n\n<section class=\"wp-block-uagb-container uagb-block-b1dbcb8c alignfull uagb-is-root-container\">\n<div class=\"wp-block-uagb-container uagb-layout-grid uagb-block-8ddcd077\">\n<div class=\"wp-block-uagb-info-box uagb-block-879ce2ec uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><\/div><div class=\"uagb-ifb-separator\"><\/div><p class=\"uagb-ifb-desc\">MBA has completed the piping installation and commissioning of a <strong>10 t\/h big-bag bitumen melting plant, a 1,000,000 kcal\/h thermal oil heater, and a 25 m\u00b3\/h bitumen pump<\/strong> supplied for a project in Benghazi, Libya.<br><br>Following equipment supply, on-site piping installation, and commissioning, the complete system was handed over to our customer.<\/p><\/div><\/div>\n<\/div>\n<\/section>\n\n\n\n<div class=\"wp-block-uagb-image aligncenter uagb-block-8c135f87 wp-block-uagb-image--layout-default wp-block-uagb-image--effect-static wp-block-uagb-image--align-center\"><figure class=\"wp-block-uagb-image__figure\"><img decoding=\"async\" src=\"https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant-1024x1024.webp\" alt=\"Big bag bitumen melting system in Libya.\" class=\"uag-image-23005\" width=\"546\" height=\"400\" title=\"Big bag bitumen melting plant\" loading=\"lazy\" role=\"img\" \/><\/figure><\/div>\n\n\n\n<section class=\"wp-block-uagb-container uagb-block-4827e2f1 alignfull uagb-is-root-container\">\n<div class=\"wp-block-uagb-container uagb-layout-grid uagb-block-e7051bd8\">\n<div class=\"wp-block-uagb-info-box uagb-block-7376fd64 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h2 class=\"uagb-ifb-title\">Technical Scope of the Benghazi Project<\/h2><\/div><div class=\"uagb-ifb-separator\"><\/div><p class=\"uagb-ifb-desc\">The project included a <strong>10 t\/h bitumen melting plant<\/strong> for melting bitumen supplied in big bags. A <strong>1,000,000 kcal\/h thermal oil heater<\/strong> was provided to meet the heating requirements of the melting process.<br><br>Our team completed the thermal oil piping between the heater and the melting plant on site, establishing the heating connections required for operation.<br><br>A <strong>25 m\u00b3\/h bitumen pump<\/strong> was installed to transfer the melted bitumen. This figure refers to the pump\u2019s transfer capacity; the melting capacity of the plant is 10 t\/h.<br>The melting, heating, and transfer equipment was installed together to meet the project requirements.<\/p><\/div><\/div>\n<\/div>\n<\/section>\n\n\n\n<section class=\"wp-block-uagb-container uagb-block-68ffa552 alignfull uagb-is-root-container\">\n<div class=\"wp-block-uagb-container uagb-layout-grid uagb-block-45e21622\">\n<div class=\"wp-block-uagb-info-box uagb-block-9fce6f6e uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h2 class=\"uagb-ifb-title\">On-Site Piping Installation and Commissioning<\/h2><\/div><div class=\"uagb-ifb-separator\"><\/div><p class=\"uagb-ifb-desc\">After the equipment arrived in Benghazi, our team carried out the on-site piping work. MBA completed the connections between the bitumen melting plant, thermal oil heater, and bitumen pump.<br><br>Once the piping installation was complete, the system was commissioned. Heating, bitumen melting, and melted bitumen transfer operations were carried out, bringing the plant into operation.<br><br>MBA\u2019s scope covered equipment supply, on-site piping installation, and commissioning. The system was handed over to our customer upon completion of these works.<\/p><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-info-box uagb-block-5ccf2ee3 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h2 class=\"uagb-ifb-title\">Integrated Bitumen Melting, Heating, and Transfer<\/h2><\/div><div class=\"uagb-ifb-separator\"><\/div><p class=\"uagb-ifb-desc\">Big-bag bitumen melting projects require the melting unit, heating equipment, and transfer system to be considered together. The piping connections between these units are an essential part of bringing the complete system into operation.<br><br>In the Benghazi project, the thermal oil heater supplied the heat required for melting, while the bitumen pump handled the transfer of the melted product. The project was completed with piping installation and commissioning covering all three units.<br><br>This installation in Libya is another completed MBA project combining bitumen equipment supply with on-site services.<\/p><\/div><\/div>\n\n\n\n<div class=\"wp-block-uagb-info-box uagb-block-0f9eb704 uagb-infobox__content-wrap  uagb-infobox-icon-above-title uagb-infobox-image-valign-top\"><div class=\"uagb-ifb-content\"><div class=\"uagb-ifb-title-wrap\"><h2 class=\"uagb-ifb-title\">Learn More About the Equipment Used<\/h2><\/div><div class=\"uagb-ifb-separator\"><\/div><p class=\"uagb-ifb-desc\">Explore our <strong><a href=\"https:\/\/mbaplant.com\/en\/bitumen-bag-decanter\/\" data-type=\"link\" data-id=\"https:\/\/mbaplant.com\/en\/bitumen-bag-decanter\/\">big bag bitumen melting plant<\/a><\/strong> and <strong><a href=\"https:\/\/mbaplant.com\/en\/thermal-oil-boiler\/\" data-type=\"link\" data-id=\"https:\/\/mbaplant.com\/en\/thermal-oil-boiler\/\">thermal oil heater<\/a><\/strong> product pages for available capacities and technical options.<br><br>For melted bitumen transfer requirements, learn more about our <strong>bitumen pump solutions<\/strong>.<br><br>To discuss your project\u2019s melting, heating, and transfer requirements and request a quotation, <strong><a href=\"https:\/\/mbaplant.com\/en\/contacts\/\" data-type=\"link\" data-id=\"https:\/\/mbaplant.com\/en\/contacts\/\">contact<\/a> MBA<\/strong>.<\/p><\/div><\/div>\n<\/div>\n<\/section>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":23005,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"disabled","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"_joinchat":[],"footnotes":""},"categories":[36],"tags":[],"class_list":["post-23004","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-mba-news"],"uagb_featured_image_src":{"full":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant.webp",1254,1254,false],"thumbnail":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant-150x150.webp",150,150,true],"medium":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant-300x300.webp",300,300,true],"medium_large":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant-768x768.webp",768,768,true],"large":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant-1024x1024.webp",1024,1024,true],"1536x1536":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant.webp",1254,1254,false],"2048x2048":["https:\/\/mbaplant.com\/wp-content\/uploads\/2026\/11\/Big-bag-bitumen-melting-plant.webp",1254,1254,false]},"uagb_author_info":{"display_name":"mbayonetici","author_link":"https:\/\/mbaplant.com\/en\/author\/mbayonetici\/"},"uagb_comment_info":0,"uagb_excerpt":null,"_links":{"self":[{"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/posts\/23004","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/comments?post=23004"}],"version-history":[{"count":2,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/posts\/23004\/revisions"}],"predecessor-version":[{"id":23026,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/posts\/23004\/revisions\/23026"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/media\/23005"}],"wp:attachment":[{"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/media?parent=23004"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/categories?post=23004"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mbaplant.com\/en\/wp-json\/wp\/v2\/tags?post=23004"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}